beBee background
Professionals
>
Engineering / Architecture
>
Pābna
Nazmul Hossain

Nazmul Hossain

Electrician, Dishwasher,Cleaner
Pābna, পাবনা জেলা
(0)

Social


About Nazmul Hossain:

Energetic and self-motivated team player bringing 5+years of intern experience and field practice to the job. Looking to join a fast –growing startup like modern technologies to grow my knowledge, contribute innovative solution to technical problems and implement conceptual designs.

I have graduated at Electrical and Electronic Engineering from Bangladesh in the institute of Shahjalal University of Science and Technology. After graduation I have been worked in kazi farm and hatchery as a executive manager. I worked there as maintenance engineer and supervised to worker. I worked there egg hatching to the incubator and production chick doc. 

  • Hatching Egg receive from farm and storage in the cold room. I had to fumigate (formaldehyde gas Like potassium permanganate KmnO4) hatching eggs before storage. Hatching eggs had to sorting like A grade, B grade, sorting them which hatching eggs are oval shape, round shape, pole shape etc.
  • After sorting hatching eggs set onto the incubator tray according to storage time like follow FIFO rules. Tray should be clean and tide, to ensure disinfected spray and fumigate them before egg set up.
  • Incubator machine check whether it is ready or not (check temperature heater, fan, turning 45 degree etc) and fumigate 20 min almost every incubator.  
  • Setup eggs tray put into incubator trolley and after that if incubator setter ready trolley entering into the incubator setter for 18 days and change trolley position every 3 days later according to machine capacity and machine system. Take to eggs temperature (99.5 to 100.5 degree F ) according to incubation hours.
  • After 18 days later transfer eggs to the hatcher basket and put them into hatcher incubator for 3 days. Almost 21 days or 500-510 hours hatching time is determined. 
  • After hatched chicks sorting and boxing in the production room.
  • This procedure I had to monitor and equivalent machine had to maintained (heater, Ac , Havac, chiller, spray pump, generator, Power factor, etc ).
  • Motivate and coach employees to meet service, Electrical Equipment maintenance and repair.
  • Electrical Sub-station operation and maintenance
  • Power system and power generation
  • Electrical wiring and Electrical Switch board design
  • Three phase motor connection
  • Air condition install and maintenance 
  • Electrical Transformer design 

 

Experience

  • Hatching Egg receive from farm and storage in the cold room. I had to fumigate (formaldehyde gas Like potassium permanganate KmnO4) hatching eggs before storage. Hatching eggs had to sorting like A grade, B grade, sorting them which hatching eggs are oval shape, round shape, pole shape etc.
  • After sorting hatching eggs set onto the incubator tray according to storage time like follow FIFO rules. Tray should be clean and tide, to ensure disinfected spray and fumigate them before egg set up.
  • Incubator machine check whether it is ready or not (check temperature heater, fan, turning 45 degree etc) and fumigate 20 min almost every incubator.  
  • Setup eggs tray put into incubator trolley and after that if incubator setter ready trolley entering into the incubator setter for 18 days and change trolley position every 3 days later according to machine capacity and machine system. Take to eggs temperature (99.5 to 100.5 degree F ) according to incubation hours.
  • After 18 days later transfer eggs to the hatcher basket and put them into hatcher incubator for 3 days. Almost 21 days or 500-510 hours hatching time is determined. 
  • After hatched chicks sorting and boxing in the production room.
  • This procedure I had to monitor and equivalent machine had to maintained (heater, Ac , Havac, chiller, spray pump, generator, Power factor, etc ).
  • Motivate and coach employees to meet service, Electrical Equipment maintenance and repair.
  • Electrical Sub-station operation and maintenance
  • Power system and power generation
  • Electrical wiring and Electrical Switch board design
  • Three phase motor connection
  • Air condition install and maintenance 
  • Electrical Transformer design 

Education

Electrical and Electronic Engineer in 2016

Higher Secondary School Certificate in 2009 at science 

Secondary School certificate in 2007 at science  

Professionals in the same Engineering / Architecture sector as Nazmul Hossain

Professionals from different sectors near Pābna, পাবনা জেলা

Other users who are called Nazmul

Jobs near Pābna, পাবনা জেলা

  • Apartment Properties

    Executive - (Customer Relationship & Accounts)

    Found in: beBee S2 BD - 5 days ago


    Apartment Properties Mirpur, Bangladesh Full time

    Vacancy · 05 · Job Context · Must u have to deal loan, finance & recovery job experience with reputed financial organization at lest 02 years. · comprehensive knowledge of modern financial management, VAT, Tax and desired accounting methods · The incumbent should be capable ...

  • Manager

    কেয়ারটেকার অবশ্য।

    Found in: beBee S2 BD - 3 days ago


    Manager Mirpur, Bangladesh Full time

    পদের নাম: কেয়ারটেকার · শিক্ষাগত যোগ্যতা ঃ প্রয়োজন নেই · বেতন ঃ ১৫,০০০ থেকে ১৭,৫০০ টাকা · ডিউটি ঃ ৮ ঘন্টা + ওভারটাইম · বয়স ঃ ১৮ থেকে ৫০ বছর · কাজের বিবরন · ১. বাড়ি দেখা সোনার দায়িত্ব পালন করতে হবে। · ২. প্রতি ফ্লাটে গ্যাস বিলের, কারেন্ট বিল এর রিসিট প্রদান করা। · ৩. টাই ...


  • owner Mirpur, Bangladesh Full time

    ফাস্টফুড রেস্টুরেন্টের জন্য একজন মহিলা কর্মী প্রয়োজন। লোকেশন মিরপুর, রাইনখোলা । কাজের অভিজ্ঞতা থাকলে ভালো । না থাকলে শিখিয়ে দেয়া হবে । ...